A53 Carbon Steel Pipe - Steel Pipe Cut to Length – Rainbow
A53 Carbon Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
Product Description | ||||||
Product name | hot dipped galvanized steel pipe | |||||
Pipe end | plain end | |||||
Pipe Length | 3 meters-12 meters | |||||
Outside daimeter | 1/2 inch-8 inch | |||||
Pipe fittings | threaded, coupling, caps, flange, etc | |||||
Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
Surface | galvanized | |||||
Zinc Coating | > 210g/m2 | |||||
Payment term | T/T, L/C | |||||
Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
Certificate | ISO9001, SGS, TUV, BV | |||||
Specifications of Pre Galvanized Steel Pipe | ||||||
Round Pipe | Rectangular Tube | Square Tube | ||||
Nominal | Thickness | Size | Thickness | Size | Thickness | |
IN | MM | MM | MM | MM | MM | MM |
1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
—— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
—— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
—— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
—— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
—— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 |
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Steel Deep Processing
Some problems in the construction of steel structure and their solutions
Our business puts emphasis over the administration, the introduction of talented staff, plus the construction of team building, attempting hard to boost the standard and liability consciousness of personnel customers. Our corporation successfully attained IS9001 Certification and European CE Certification of A53 Carbon Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Kuala Lumpur, kazan, Manchester, We aim to build a famous brand which can influence a certain group of people and light up the whole world. We want our staff to realize self-reliance, then achieve financial freedom, lastly obtain time and spiritual freedom. We do not focus on how much fortune we can make, instead we aim to obtain high reputation and be recognized for our goods. As a result, our happiness comes from our clients satisfaction rather than how much money we earn. Ours team will do best for you personally always.
By Quyen Staten from Georgia - 2017.02.28 14:19
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
By Alex from Poland - 2018.11.28 16:25
Write your message here and send it to us