Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow
Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
Product Description:
Product Description | ||||||
Product name | hot dipped galvanized Steel Pipe | |||||
Pipe end | plain end | |||||
Pipe Length | 3 meters-12 meters | |||||
Outside daimeter | 1/2 inch-8 inch | |||||
Pipe fittings | threaded, coupling, caps, flange, etc | |||||
Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
Surface | galvanized | |||||
Zinc Coating | > 210g/m2 | |||||
Payment term | T/T, L/C | |||||
Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
Certificate | ISO9001, SGS, TUV, BV |
Product Specification:
Specifications of Pre galvanized steel pipe | ||||||
Round Pipe | Rectangular Tube | Square Tube | ||||
Nominal | Thickness | Size | Thickness | Size | Thickness | |
IN | MM | MM | MM | MM | MM | MM |
1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
—— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
—— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
—— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
—— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
—— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 |
Product Display:
We can cut the pipe to certin length according to customer’s requirement.
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Greenhouse commonly used steel greenhouse introduction
Some problems in the construction of steel structure and their solutions
Sticking to the perception of "Creating products of top of the range and earning mates with people today from all over the world", we constantly put the desire of consumers in the first place for Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: belarus, Sevilla, Cape Town, The development of our company not only needs the guarantee of quality, reasonable price and perfect service, but also relies on our customer's trust and support! In the future, we are going to continue with the most qualified and high quality service to offer the most competitive price, Together with our customers and achieve win-win! Welcome to inquiry and consult!
By Cheryl from Indonesia - 2018.06.28 19:27
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
By Eileen from Portugal - 2018.09.12 17:18
Write your message here and send it to us