Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow
Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
Product Description | ||||||
Product name | hot dipped galvanized steel pipe | |||||
Pipe end | plain end | |||||
Pipe Length | 3 meters-12 meters | |||||
Outside daimeter | 1/2 inch-8 inch | |||||
Pipe fittings | threaded, coupling, caps, flange, etc | |||||
Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
Surface | galvanized | |||||
Zinc Coating | > 210g/m2 | |||||
Payment term | T/T, L/C | |||||
Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
Certificate | ISO9001, SGS, TUV, BV | |||||
Specifications of Pre Galvanized Steel Pipe | ||||||
Round Pipe | Rectangular Tube | Square Tube | ||||
Nominal | Thickness | Size | Thickness | Size | Thickness | |
IN | MM | MM | MM | MM | MM | MM |
1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
—— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
—— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
—— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
—— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
—— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 |
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
Steel Deep Processing
We're commitment to offer you the aggressive cost ,superb products and solutions top quality, too as fast delivery for Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Serbia, Liverpool, Kuwait, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.
By Marguerite from Slovakia - 2018.12.14 15:26
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
By Afra from Luxemburg - 2018.12.22 12:52
Write your message here and send it to us