Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow

Short Description:

1,Raw Material:Q235 Steel.2,Application:Steel Prop is applied to vertically support system in the construction to support the formwork, such as the floor construction.3,Structure:Steel Prop is mainly made up of bottom plate,outer tube, inner tube, swivel nut, cotter pin, upper plate and th...


Product Detail

Product Tags

Related Video

Feedback (2)

Our firm has been concentrating on brand strategy. Customers' satisfaction is our best advertising. We also offer OEM provider for Hot Dip Galvanized Coils , Ppgi Steel Coil , Special Shaped Steel Pipe , Our enterprise insists on innovation to promote the sustainable advancement of organization, and make us become the domestic high-quality suppliers.
Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow Detail:

hf (1) hf (2)

1,Raw Material:

Q235 Steel.

2,Application:

Steel Prop is applied to vertically support system in the construction to support the formwork, such as the floor construction.

3,Structure:

Steel Prop is mainly made up of bottom plate,outer tube, inner tube, swivel nut, cotter pin, upper plate and the accessories of folding tripod,head jack, the structure is simple and flexible.

Frame scaffolding

Frame scaffolding is one of the most widely used scaffolding. Frame scaffolding has a simple disassembly, good bearing performance, safety and reliability.

Frame scaffolding main application:

(1)?For the top branch building, halls, bridges, viaducts, tunnel and other formwork support within the top.

(2)?Inside and outside the row grid scaffolding of high-rise building

(3)?For active work platform of electrical installation, hull built and other renovation work.

(4)?For temporary dormitory, warehouse or shed

(5)?For the erection of temporary grandstands and bleachers.

Classification

Description

Specifications

Theoretical Weight

Material

Surface

Frame

Portal frame

1219*1524

10.5kg

Q235

PaintedElectro-galvanizedHot Dip?GalvanizedPre-galvanized

Portal frame

1219*1700

12.5kg

Q235

Portal frame

1219*1930

13.6kg

Q235

Ladder type frame

1219*914

6.7kg

Q235

Ladder type frame

1219*1524

11.2kg

Q235

Ladder type frame

1219*1700

12.3kg

Q235

Ladder type frame

1219*1930

14.6kg

Q235

Classification

Description

Specifications

Theoretical Weight

Material

Surface

Cross Brace

21*1.4*1363

1.9kg

Q235

PaintedElectro-galvanizedHot Dip?GalvanizedPre-galvanized

21*1.4*1724

2.35kg

Q235

21*1.4*1928

2.67kg

Q235

21*1.4*2198

3kg

Q235

hf (2) hf (1)

<!–

Download as PDF

–>


Product detail pictures:

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures

Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow detail pictures


Related Product Guide:
Steel length dimension
4 kinds of methods of steel structure interlayer

Sticking to the perception of "Creating products of top of the range and earning mates with people today from all over the world", we constantly put the desire of consumers in the first place for Factory Cheap Hot H Scaffolding Frame – Frame Scaffolding – Rainbow , The product will supply to all over the world, such as: Doha, Stuttgart, United States, Besides there are also professional production and management , advanced production equipment to assure our quality and delivery time , our company pursues the principle of good faith, high-quality and high-efficiency. We guarantee that our company will try our best to reduce customer purchase cost, shorten the period of purchase, stable products quality, increase customers' satisfaction and achieve win-win situation .
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Carey from Italy - 2017.11.12 12:31
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Elizabeth from Georgia - 2018.11.28 16:25
    Write your message here and send it to us