Formwork Clamp is a high-strength concrete forming system designed for fast-paced gangform operations. It has the strength required for the large contact areas and fast pour rates common in large gangform applications.
FORMWORK Wedge Clamps/Doka Clamps
This kind of Wedge panel framax clamp is made by casted(2.8kg) or Forged (3.2kg). Most customers choose drop forged type which is stronger and can load more capacity.
1) Raw material: Q235
2) Processing method: drop forged/casted
3) Weight: 2.80/3.20kg
4) Finishing: Zinc plated
5) Processing capacity: 25 containers per month
6) Test Standard: ANSI/SSFI SC100-5/05
7) Package: plastic woven bags and steel pallet.
Post time: Jan-08-2025