PriceList for Steel C Channel - Square pipe for Fixed Solar Mounting System – Rainbow
PriceList for Steel C Channel - Square pipe for Fixed Solar Mounting System – Rainbow Detail:
According to different?project topography and meteorological environment, we provide customer with solutions such as double pole solar solution, single poles solar?solution, screw pile solar solution, combination of steel pole and embedded concrete, single pole of fishing complementary solution and PV agricultural greenhouse solution.
We provide customer with all the steel material for solar fixed mounting system, including front and rare columns, main pillars,beams, inclined beams, purlins.
The material mainly used?for fixed solar system?are:
1.Steel C/U channel:
Item: Hot dip galvanized Cold Formed C/U Profile Ground Piles
Material: Q355,S355
Standard: GB/T1591
Surface: Hot dip galvanized according to ASTM A123, BS4687, GB/T13912
Specification: C80*80*15*3.0, C100*100*20*3.5, U150*80*4.0, U160*80*4.5
C Channel
Type |
Spec. |
Thickness |
Material |
Surface Treatment |
Punching |
Length |
C41*21 |
1.5/2.0mm |
Q235B/Q345B |
Hot dip galvanized 65-80um |
9*30/11*30/13.5*30 |
As customer |
Product detail pictures:
Related Product Guide:
Steel length dimension
Greenhouse commonly used steel greenhouse introduction
We will make just about every exertion for being excellent and perfect, and speed up our actions for standing during the rank of worldwide top-grade and high-tech enterprises for PriceList for Steel C Channel - Square pipe for Fixed Solar Mounting System – Rainbow , The product will supply to all over the world, such as: Munich, Ecuador, South Korea, We firmly think that we have the full capability to give you contented merchandise. Wish to collect concerns within you and build a new long-term synergy romantic relationship. We all significantly promise:Csame excellent, better selling price; exact selling price, better quality.
By Candance from Adelaide - 2018.06.18 19:26
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Janet from Rome - 2018.06.26 19:27