Round Steel Pipe - Steel Pipe Cut to Length – Rainbow
Round Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
Product Description | ||||||
Product name | hot dipped galvanized steel pipe | |||||
Pipe end | plain end | |||||
Pipe Length | 3 meters-12 meters | |||||
Outside daimeter | 1/2 inch-8 inch | |||||
Pipe fittings | threaded, coupling, caps, flange, etc | |||||
Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
Surface | galvanized | |||||
Zinc Coating | > 210g/m2 | |||||
Payment term | T/T, L/C | |||||
Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
Certificate | ISO9001, SGS, TUV, BV | |||||
Specifications of Pre Galvanized Steel Pipe | ||||||
Round Pipe | Rectangular Tube | Square Tube | ||||
Nominal | Thickness | Size | Thickness | Size | Thickness | |
IN | MM | MM | MM | MM | MM | MM |
1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
—— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
—— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
—— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
—— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
—— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 |
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
Fire protection measures for steel structures
In the past few years, our business absorbed and digested advanced technologies both equally at home and abroad. In the meantime, our company staffs a group of experts devoted to your advancement of Round Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Algeria, Greece, Chile, Welcome to visit our company, factory and our showroom where displays various products that will meet your expectation. Meanwhile, it is convenient to visit our website, and our sales staff will try their best to provide you the best service. Please contact us if you need more information. Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation.
By Karen from Palestine - 2018.09.23 17:37
The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
By Jodie from Adelaide - 2017.10.23 10:29
Write your message here and send it to us