Steel C Channel - H Beam for Fixed Solar Mounting System – Rainbow
Steel C Channel - H Beam for Fixed Solar Mounting System – Rainbow Detail:
According to different?project topography and meteorological environment, we provide customer with solutions such as double pole solar solution, single poles solar?solution, screw pile solar solution, combination of steel pole and embedded concrete, single pole of fishing complementary solution and PV agricultural greenhouse solution.
We provide customer with all the steel material for solar fixed mounting system, including front and rare columns, main pillars,beams, inclined beams, purlins.
The material mainly used?for fixed solar system?are:
1.Steel C/U channel:
Item: Hot dip galvanized Cold Formed C/U Profile Ground Piles
Material: Q355,S355
Standard: GB/T1591
Surface: Hot dip galvanized according to ASTM A123, BS4687, GB/T13912
Specification: C80*80*15*3.0, C100*100*20*3.5, U150*80*4.0, U160*80*4.5
C Channel
Type |
Spec. |
Thickness |
Material |
Surface Treatment |
Punching |
Length |
C41*21 |
1.5/2.0mm |
Q235B/Q345B |
Hot dip galvanized 65-80um |
9*30/11*30/13.5*30 |
As customer |
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
4 kinds of methods of steel structure interlayer
Our organization promises all customers with the first-class products and solutions and the most satisfying post-sale service. We warmly welcome our regular and new clients to join us for Steel C Channel - H Beam for Fixed Solar Mounting System – Rainbow , The product will supply to all over the world, such as: Austria, Croatia, Egypt, Profession, Devoting are always fundamental to our mission. We've got always been in line with serving customers, creating value management objectives and adhering to the sincerity, dedication, persistent management idea.
By Karen from Morocco - 2017.09.16 13:44
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Prima from Toronto - 2018.06.21 17:11