Steel Welded Pipe Tube for Steel Products

Short Description:

Pre-galvanized steel tubes are widely used in many areas. Our factory is manufacturing good quality steel tubes in different sizes and wall thicknesses. During processing, both inner and out side welding line will be removed. Please feel free to contact me for further information.


Product Detail

Product Tags

Product Description:

 with hot dip coating or electric-galvanized coating on the surface of galvanized . Galvanizing can  increase the corrosion resistance of steel pipes and prolong their service life.  are widely used, not only as pipelines for water, gas, oil and other general low-pressure fluids, but also as oil well pipes and oil pipelines in the petroleum industry, especially in offshore oil fields, oil heaters, condensation coolers, tubes for coal distillation and washing oil exchangers in chemical coking equipment, and tubes for trestle pipe piles and support frames in mine tunnels.

round 3
round 4
steel round1

Product Specification:

Secondary or not Non-secondary
Alloy or not Non-alloy
Technique ERW, hot rolled or cold rolled
Standard BS 1387, BS EN 39, GB/T 3091, ASTM A53,
JIS G3444, etc.
Grade/Material 10#, 20#, 45#, Q195, Q235, Q345, 16Mn, ST 37.4, etc.
Place of origin Tianjin, China(Mainland)
Certifications ISO 9001:2008, BV, SGS, ABS
Production capacity 3500 ton/Month
Section shape Round
Outer diameter 20-325mm
Wall thickness 0.5-25mm
Length 2-12m, or cut as request.
Technique tolerance OD: +/-1mm, WT: +/-0.5mm, L: +/-20mm
Surface treatment Galvanized, painted, oiled, printed or powder coated
Zinc coated pre-galvanized, 80-120 g/m2;
hot dip galvanized, 230-500 g/m2
Colour Silver, black or painted as request
End of pipe Plain?burred,beveled, threaded
Trade term FOB Tianjin China, CIF, C&F
Loading Port Tianjin Xingang Port, China
Package 1.Big OD: in bulk;
2.Small OD: in bundles, packed by steel strips;
3. Waterproof package with plastic cloth;
4.Standard export package;
5.According to customers

FAQ:

1. Q:How long is the normal delivery time of your products?

A: 30-40 days after receiving the deposit.

2. Q: What is the MOQ of the product?

A: MOQ is 10 tons.

3. Q: How do your customers find your company?

A: Firstly, we have our own webite, google, alibaba and so on. Secondly, we take part in some exhibitions to show our products. Finally, some of our customs always recommend our products and company to their customers and friends.


  • Previous:
  • Next:

  • Write your message here and send it to us