Submerged Arc Pipe - Steel Pipe Cut to Length – Rainbow
Submerged Arc Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
Product Description | ||||||
Product name | hot dipped galvanized steel pipe | |||||
Pipe end | plain end | |||||
Pipe Length | 3 meters-12 meters | |||||
Outside daimeter | 1/2 inch-8 inch | |||||
Pipe fittings | threaded, coupling, caps, flange, etc | |||||
Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
Surface | galvanized | |||||
Zinc Coating | > 210g/m2 | |||||
Payment term | T/T, L/C | |||||
Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
Certificate | ISO9001, SGS, TUV, BV | |||||
Specifications of Pre Galvanized Steel Pipe | ||||||
Round Pipe | Rectangular Tube | Square Tube | ||||
Nominal | Thickness | Size | Thickness | Size | Thickness | |
IN | MM | MM | MM | MM | MM | MM |
1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
—— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
—— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
—— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
—— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
—— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 |
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
Steel Deep Processing
Our organization sticks to your principle of "Quality may be the life of your organization, and reputation will be the soul of it" for Submerged Arc Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Roman, Spain, Istanbul, Qualified R&D engineer might be there for your consultation service and we will try our best to meet your requirements. So you should feel free to contact us for inquiries. You'll be able to send us emails or call us for small business. Also you are able to come to our business by yourself to get further knowing of us. And we are going to surely present you with the best quotation and after-sale service. We're ready to build stable and friendly relations with our merchants. To achieve mutual success, we'll make our best efforts to build a solid co-operation and transparent communication work with our companions. Above all, we're here to welcome your inquiries for any of our merchandise and service.
By Mary from Philadelphia - 2017.05.02 18:28
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
By Esther from Iran - 2018.09.21 11:44
Write your message here and send it to us